GALLERY
A selection of our work. Please contact us for additonal information.
API 650 Tank
API 650 Tank complete with spiral staircase and heating coilVale Inco
API tanks being erected at Hamilton PierSpiral Staircase
A spiral staircase is fabricated to fit a field erected storage tankMII crane
Mainway Industrial's crane on-site on Vale Inco projectStructural Frame Fabrication
MII shop fabricates a structural frame.Heavy Duty Rigging
Mainway Industrial Personnel secures a large hopper before liftingPlatform fabrication
MII fabricates a large platform to fit an already existing facility.Tank erection
Mainway Industrial Crane uses its reach to assist PersonnelAerial view of Bitumar Facility
View shows Bitumar facility during erection phase. Mainway Industrial Crane can be seen working on one of the larger tanksAPI 650 tank
API tank complete with spiral staircase and insulation gridStack
Mainway fabricates New stack in its shop facilityPumping station
An underground pumping station is installed by Mainway Industrial's piping divisionMainway Industrial Transport
Show More